Why permits exist
Building permits and inspections help make sure work meets safety codes for structure, fire, electrical, plumbing, and energy. They also create a record that the work was done and checked, which can matter when you sell your home or make an insurance claim.
When a permit is commonly needed
Requirements differ by city and county, so always confirm locally. Work that often requires a permit includes:
- Structural changes, additions, and new decks or porches.
- New or altered electrical circuits and panel work.
- New or relocated plumbing, water heater replacements, and gas lines.
- Roof replacement and some window or door changes.
- Finishing a basement or converting space.
Cosmetic work such as painting or replacing flooring typically does not, but there are exceptions, for example in historic districts or condominiums.
Who pulls the permit
Often the contractor pulls permits for the work they perform, and it should be stated in the contract. Homeowners can sometimes pull their own permits, but that also makes you responsible for the work passing inspection. Ask who is responsible, who pays the fee, and how inspection scheduling will work.
Be cautious if anyone suggests skipping a required permit to save time or money. Unpermitted work may need to be opened up or redone later.
How inspections fit the schedule
Inspections happen at defined stages, commonly before walls are closed up and again when the work is complete. Work usually cannot continue past an inspection point until it passes, so inspector availability can influence the schedule. Build slack into your timeline for scheduling and for any corrections.
Other rules to check
- Homeowners association or condominium rules about exterior changes, noise, and work hours.
- Historic district review for exterior changes.
- Utility requirements, for example for service upgrades.
- Local requirements for lead-safe practices in older homes.
Build a realistic timeline
- Planning and design, including selecting products and finishes.
- Estimating and contracting.
- Permit review, which can take days or weeks depending on your jurisdiction.
- Ordering and delivery of materials, particularly long-lead items.
- Construction, with inspections at set stages.
- Final inspection, punch list, and closeout.
Add buffer time at each step. A schedule that depends on everything going perfectly is rarely a schedule that holds.